Close 8D.6 With Validation Sign-Off
This commit is contained in:
@@ -126,6 +126,8 @@ If 8D.3 exceeds the work-unit limit, first split out inert login-page rendering
|
||||
|
||||
### 8D.6 — Browser terminal selector and serial-lease preservation
|
||||
|
||||
**Target sign-off (2026-09-06):** User confirms the remaining validation checks after 60-second boot/full-client-mix/partial-cleanup telemetry, and closes 8D.6. [Evidence and handoff](phase8d6_implementation.md#target-sign-off-and-evidence-2026-09-06). Full mix at **230400 baud** includes browser/admin SSH and four serial broker clients with one web writer. Internal/DMA lifetime minima **6,516 / 1,580 B** remain a numeric-reserve follow-up, not a claim of exhaustion or grounds to reopen sign-off. Exact flashed revision/browser/repetition counts/soak duration were not separately supplied. Latest cosmetic toolbar build passes in **7.60 s**, unchanged **95,580 B RAM / 1,646,489 B flash**, with 17 UI groups/CSP checks passing. Supersedes older pending notes below. Wait for separately requested **8D.7**; M2 remains open.
|
||||
|
||||
**Implementation checkpoint (2026-09-06, updated after review fixes):** [8D.6 implementation, accounting and target checklist](phase8d6_implementation.md). Implemented / host-tested / build-verified; target validation and parent re-review of fixes pending, no phase sign-off or M2 completion. Both P2 findings fixed: session identity changes require a clean document before adopting a new view, and fit caches only successful measurements with three bounded readiness retries. Sixteen production-rendered UI groups and focused UI/auth/store reruns pass; prior admin/console regression results remain recorded. Final finite `pio run`: **21.35 s, 95,580 B RAM / 1,646,489 B flash**, **0 / +9,216 B** versus 8D.5; cumulative **+1,048 / +46,516 B** versus 8D.0; review-only delta **0 / +1,376 B**. No backend/capacity/8D.7 restriction/asset change. Numeric reserves remain open; prior sign-offs stand. Stop for validation/user decision before separately requested 8D.7. This supersedes older planned-8D.6 status text in this document.
|
||||
|
||||
**Start in:** `src/web_ui.{c,h}`, using the completed serial/admin protocols.
|
||||
|
||||
Reference in New Issue
Block a user