Move wiring documentation under docs directory
This commit is contained in:
@@ -18,7 +18,7 @@ Hardware characterization, the serial core, session broker, and native USB CDC-A
|
|||||||
|
|
||||||
## Documentation
|
## Documentation
|
||||||
|
|
||||||
- [Hardware wiring](wiring.md): hardware profile, GPIO assignments, connector guidance, and safety notes.
|
- [Hardware wiring](docs/wiring.md): hardware profile, GPIO assignments, connector guidance, and safety notes.
|
||||||
- [Electrical tests](docs/electrical_tests.md): MAX3243, UART loopback, and session-broker verification procedures.
|
- [Electrical tests](docs/electrical_tests.md): MAX3243, UART loopback, and session-broker verification procedures.
|
||||||
- [Command reference](docs/command_reference.md): UART0 administration, serial, broker, USB, Wi-Fi, web, SSH, and diagnostic commands.
|
- [Command reference](docs/command_reference.md): UART0 administration, serial, broker, USB, Wi-Fi, web, SSH, and diagnostic commands.
|
||||||
|
|
||||||
|
|||||||
@@ -102,7 +102,7 @@ Native USB CDC DTR controls the lifetime of the `usb-cdc` broker client but is n
|
|||||||
|
|
||||||
## Electrical verification
|
## Electrical verification
|
||||||
|
|
||||||
See [Electrical tests](docs/electrical_tests.md) for safe loopback wiring, polarity checks, UART flow-control verification, and session-broker loopback testing.
|
See [Electrical tests](electrical_tests.md) for safe loopback wiring, polarity checks, UART flow-control verification, and session-broker loopback testing.
|
||||||
|
|
||||||
## Future hardware profiles
|
## Future hardware profiles
|
||||||
|
|
||||||
Reference in New Issue
Block a user