Record Phase 8D.3 M1 sign-off
This commit is contained in:
@@ -1,6 +1,6 @@
|
||||
# Phase 8D.0 — Baseline and M1 browser contract
|
||||
|
||||
Status: **8D.0 and 8D.1 validated by user sign-off on 2026-09-05.** Documentation/source audit, builds and target runtime samples are recorded. Numeric reserve floors and future incremental budgets remain open engineering gates, not blockers to these user-approved closures. The M1 browser contract below was established during baseline planning; the subsequent [8D.3 live cutover record](phase8d3_implementation.md) now documents implemented/host-tested/build-verified authentication, with target/browser acceptance pending. Baseline measurements and source-behavior descriptions here remain historical, not measurements of the live cutover. See [execution plan](phase8d_plan.md) and [acceptance matrix](user_administration_tests.md#planned-phase-8d-integrated-web-administration).
|
||||
Status: **8D.0 and 8D.1 validated by user sign-off on 2026-09-05.** Documentation/source audit, builds and target runtime samples are recorded. Numeric reserve floors and future incremental budgets remain open engineering gates, not blockers to these user-approved closures. The M1 browser contract below was established during baseline planning; the subsequent [8D.3 live cutover record](phase8d3_implementation.md) now documents implemented/host-tested/build-verified authentication and explicit 8D.3/M1 user sign-off after post-soak evidence on 2026-09-06. Numeric reserve gates remain open. Baseline measurements and source-behavior descriptions here remain historical, not measurements of the live cutover. See [execution plan](phase8d_plan.md) and [acceptance matrix](user_administration_tests.md#planned-phase-8d-integrated-web-administration).
|
||||
|
||||
## Validation sign-off
|
||||
|
||||
|
||||
Reference in New Issue
Block a user