Commit Graph
8 Commits
Author SHA1 Message Date
Commander1024 c257158ada Record Accepted PCB Placement And Fit
Align component groups, repair affected routing, and add preservation
audits.
Assign the confirmed U2 footprint and update pull-ups to 2 kΩ across
design files.
Document user acceptance, switch to an A3 worksheet, and refresh PCB
exports.
2026-09-22 10:28:08 +02:00
Commander1024 901afbe754 Integrate Measured ESP32 PCB Geometry
- Add measured F.Fab bounds and USB mouth markers
- Add guarded preservation and regression validation
- Refresh review exports and remove draft presentation labels
2026-09-21 22:54:37 +02:00
Commander1024 ab6a8010ba Restructure project documentation
Separate operator guides from development contracts, relocate
implementation notes under `docs/devel/`, and update cross-references
and
hardware tooling paths. Add getting-started, user administration, and
firmware update guides while preserving firmware behavior.
2026-09-21 15:24:42 +02:00
Commander1024 655f26a611 Clarify Service Contracts And Security Invariants 2026-09-21 13:39:30 +02:00
Commander1024 6406142b21 Add DB9 CAD reference data 2026-09-21 12:32:19 +02:00
Commander1024 7d76a41540 Advance PCB carrier to A1 layout
Reposition the ESP32 and RS-232 reference within the notched outline,
preserve the A0 snapshot, and add second-pass two-layer routing
evidence.
Refresh validation reports and draft previews while keeping fabrication
status provisional.
2026-09-21 12:32:01 +02:00
Commander1024 c0f7a1ad51 Integrate A1 carrier PCB CAD updates
- Add pinned STEP-derived DE-9 mechanical measurements and provenance
- Refresh placement, routing, silkscreen, and nominal CAD envelopes
- Document provisional dimensions, assumptions, and validation status
2026-09-21 12:31:24 +02:00
Commander1024 60c1e279d6 Add KiCad module carrier PCB draft
Introduce an editable KiCad 10 schematic and routed two-layer 82 × 80 mm
layout with local provisional footprints, validation tooling, and
component
research. Keep the RS-232 male-module mapping and mechanical clearances
explicitly provisional pending hardware verification.
2026-09-20 23:14:01 +02:00